Home > Safe Routes to School > Grant Information |
|
| |
|
|
| |
|
| |
| | SRTS Grant information | |
|
|
|
|
|
|
|
|
| |
|
|
| |
|
Agency |
Original Funding |
|
|
|
2007
|
Allegany Board of Education |
$90,000 |
Cash Valley Elem
|
|
|
|
Flintstone Elem |
228 |
|
|
TOTAL # Students
|
529 |
Program Plans:
1. Infrastructure (sidewalks)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Approximately 600 students have participated in the after school ped/bike safety education programs
2. Law enforcement details have dramatically reduced number of speeding citations around schools |
| |
| |
|
|
| |
|
Agency |
Original Funding |
|
|
|
2008 - 2009
|
Allegany Board of Education |
$72,000 |
Beall Elem
|
|
|
|
South Penn Elem |
|
|
|
TOTAL # Students
|
|
Program Plans:
1. Infrastructure (Pedestrian signals / signage / school zone signage)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Approximately 400 students have participated in the after school ped/bike safety education programs
2. Law enforcement details have dramatically reduced number of speeding citations around schools |
| |
| |
|
|
| |
|
Agency |
Original Funding |
|
|
|
2009 - 2010
|
Allegany Board of Education |
$256,900 |
All Elem and Middle Schools |
|
|
|
|
TOTAL # Students
|
5,794 |
Program Plans:
1. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
2. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Third year grant activities are just beginning. Second year grant carried over through 2009 |
| |
| |
|
|
| |
|
Agency |
Original Funding |
|
|
|
2010 - 2011
|
Local Management Board of Allegany Co |
$209,400 |
All Elem and Middle Schools |
|
|
|
|
TOTAL # Students
|
6,071 |
Program Plans:
1. Infrastructure (replace footbridge)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program
|
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
| |
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| ANNE ARUNDEL |
2007
|
City of Annapolis
|
$28,900
|
Annapolis Elem |
200 |
|
|
St. Mary's Elem
|
990
|
|
|
TOTAL # Students
|
1,290
|
Program Plans:
1. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
2. Bike Rodeos
3. Infrastructure (traffic engineering study, crosswalks)
4. Encouragement Program |
Program Highlights to Date:
1. Effective law enforcement details resulting in many warnings, tickets, and 20 arrests
2. Development of a Safe Routes to School Coalition involving school, law enforcement, and community members |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| ANNE ARUNDEL |
2008 - 2009
|
City of Annapolis
|
$63,800
|
Annapolis Elem |
200 |
|
|
St. Mary's Elem
|
990
|
|
|
TOTAL # Students
|
1,290
|
Program Plans:
1. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
2. Bike Rodeos
3. Infrastructure (traffic engineering study, crosswalks)
4. Encouragement Program |
Program Highlights to Date:
|
|
|
| |
|
|
| |
|
Agency
|
Original Funding
|
Schools |
# Students |
|
2007
|
Department of Transportation |
$720,700
|
|
477 |
| |
|
Lyndhurst Elem |
292 |
| |
|
Charles Carroll Barrister Elem |
298 |
| |
|
Samuel F.B. Morse Elem |
400 |
| |
|
|
|
| |
|
William Paca Elem
|
650 |
| |
|
Patterson Park Charter
|
560
|
| |
|
|
2,932 |
Program Plans:
1. Infrastructure (sidewalks, crosswalks, pedestrian signals/signage, schoolzone signage)
2. Bicycle / Pedestrian Education Program
3. Participate in International Walk to School Day each October
4. Crossing Guard Appreciation Event
5. Outreach to educate parents |
Program Highlights to Date:
1. Implementation of "Train the Trainer" program to teach ped/bike curriculum to phys ed teachers for presentation in PE classes
2. Successful parent outreach through event participation and PTA programs
3. Completed Infrastructure (122 pedestrian countdown sig, 10 school zone signs) |
|
|
| |
|
|
| |
|
Agency
|
Original Funding
|
Schools |
# Students |
|
2008 - 2010
|
Department of Transportation |
$555,600
|
|
658 |
| |
|
Harriet Tubman Elem |
198 |
| |
|
Westside Elem |
260 |
| |
|
Commodore John Rodgers Elem |
285 |
| |
|
Gardenville Elem
|
|
| |
|
|
1,734
|
Program Plans:
1. Infrastructure (sidewalks, crosswalks, pedestrian signals/signage, schoolzone signage)
2. Bicycle / Pedestrian Education Program
3. Develop "Train the Trainer" Program and make curriculum part of PE classes
4. Crossing Guard Appreciation Event
5. Walkability Audits |
Program Highlights to Date:
1 .Implementation of "Train the Trainer" program to teach ped/bike curriculum to phys ed teachers for presentation in PE classes
2. Approval of Ped/Bike Safety Curriculum for use in city PE classes during school year
3. Engineering / approvals underway for infrastructure projects |
|
|
| |
|
|
| |
|
Agency
|
Original Funding
|
Schools |
# Students |
|
2009 - 2010
|
Department of Transportation |
$338,400
|
|
569 |
| |
|
Benalou Elem |
409 |
| |
|
Lakeland Elem / Middle |
632 |
| |
|
Leithwalk Elem |
933 |
| |
|
Mount Royal Elem/Middle
|
|
| |
|
Mathew Henson Elem |
455 |
| |
|
|
3,816 |
Program Plans:
1. Infrastructure (school zone signage, crosswalks, pedestrian signals / signage)
2. Bicycle / Pedestrian Education Program
3. Conduct multiple "Train the Trainer" Programs |
Program Highlights to Date:
1. Third year grant activities are just beginning. Second year grant carried over through 2009 |
|
|
| |
|
|
| |
|
Agency
|
Original Funding
|
Schools |
# Students |
|
2010 - 2011
|
Department of Transportation |
$335,900
|
|
337 |
| |
|
Brehms Lane Elem |
670 |
| |
|
Dallas F Nicholas Elem |
350 |
| |
|
Liberty Elem |
355 |
| |
|
Martin Luther King Elem/Middle
|
|
| |
|
Waverly Elem/Middle |
650 |
| |
|
Wolfe Street Academy Elem |
183 |
| |
|
Lockhurst Bundy Elem |
185 |
| |
|
William Pinderhughes Elem |
328 |
| |
|
|
3,552 |
Program Plans:
1. Infrastructure (school zone signage, crosswalks, pedestrian signals / signage)
2. Bicycle / Pedestrian Education Program
3. Conduct multiple "Train the Trainer" Programs |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| CARRO LL |
2007
|
Carroll County Health Dept.
|
$26,200
|
|
506 |
|
|
|
593 |
|
|
|
1,099 |
Program Plans:
1. Infrastructure (sidewalks) |
Program Highlights to Date:
1. Engineering / approvals underway for infrastructure projects |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| CARRO LL |
2008 - 2010
|
|
$142,000
|
|
506 |
|
|
|
593 |
|
|
|
1,099 |
Program Plans:
1. Infrastructure (sidewalks)
2. Safe Routes Public Service Announcements
3. Pedestrian Safety Billboards |
| Program Highlights to Date:
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| CARRO LL |
2009 - 2010
|
|
$12,500
|
|
409
|
|
|
|
409 |
Program Plans:
1. Infrastructure (crosswalk marking, pedestrian signals / signage) |
Program Highlights to Date:
1. Engineering / approvals underway for infrastructure projects |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| DORCHESTER |
2007
|
Dorchester County Health Department
|
$263,700
|
Choptank Elem
|
300 |
|
|
Sandy Hill Elem |
460 |
|
|
|
525 |
|
|
|
1,285 |
Program Plans:
1. Infrastructure (multi-use pedestrian / bike path, sidewalk and crossing improvements)
2. Bicycle / Pedestrian Education Program
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
4. Health and Safety presentations focused on walking / biking |
Program Highlights to Date:
1. Bids have been opened for multiuse path - construction to begin shortly
2. Law enforcement school zone detail resulted in largest drug bust in county history |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| DORCHESTER |
2008 - 2010
|
Dorchester County Health Department
|
$314,600
|
Warwick Elem
|
350
|
|
|
Vienna Elem |
171 |
|
|
|
413
|
|
|
|
934
|
Program Plans:
1. Infrastructure (sidewalks, traffic calming))
2. Bicycle / Pedestrian Education Program
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
4. Participate in International Walk to School Day each October |
Program Highlights to Date:
1. Engineering / approvals underway for infrastructure projects |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| DORCHESTER |
2009 - 2010
|
Dorchester County Health Department
|
$64,100
|
Sandy Hill Elem |
452
|
|
|
Choptank Elem |
240 |
|
|
|
539
|
|
|
Warwick Elem |
330 |
|
|
Vienna Elem |
166 |
|
|
Hurlock Elem |
422 |
|
|
|
2,149
|
Program Plans:
1. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
2. Bicycle / Pedestrian Education Program
3. Participate in International Walk to School Day each October |
Program Highlights to Date:
1. Law enforcement details are underway
2. Third year grant activities are just beginning. Second year grant carried over through 2009 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| DORCHESTER |
2010 - 2011
|
Dorchester County Health Department
|
$156,100
|
Sandy Hill Elem |
442
|
|
|
Choptank Elem |
260 |
|
|
|
555
|
|
|
Warwick Elem |
303 |
|
|
Vienna Elem |
172 |
|
|
Hurlock Elem |
442 |
|
|
|
2,174
|
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage
2. Bicycle / Pedestrian Education Program
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| FREDERICK |
|
2007
|
City of Frederick
|
$358,300
|
Parkway Elem
|
|
|
|
|
|
Program Plans:
1. Safe Routes mapping
2. Infrastructure (Sidewalks, traffic calming, ADA ramps, crosswalk marking, pedestrian signals / signage / school zone signage) |
Program Highlights to Date:
1. Installation of 2 flashing speed limit signs |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| FREDERICK |
|
2009 - 2010
|
Frederick County Public Schools |
$143,500
|
Brunswick Middle |
748
|
| |
|
Crestwood Middle |
576 |
| |
|
Centerville Elem |
811 |
| |
|
Whittier Elem |
733 |
| |
|
Monacacy Elem |
689 |
| |
|
Spring Ridge Elem |
509 |
| |
|
Hillcrest Elem |
656 |
|
|
|
4,722 |
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage)
2. Safe Routes Mapping
3. Implementation of "Walking" School Bus program |
Program Highlights to Date:
1. Engineering is underway for infrastructure projects
2. Seminar held to begin implementing "Walking" School Bus program
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| FREDERICK |
|
2010 - 2011
|
Frederick County Public Schools |
$180,0000
|
Carroll Manor Elem |
498
|
| |
|
New Market Elem |
527 |
| |
|
Orchard Grove Elem |
659 |
| |
|
Thurmont Elem |
387 |
| |
|
Twin Ridge Elem |
604 |
|
|
|
2,675 |
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage, bike racks)
2. Implementation of "Walking" School Bus program
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| GARRETT |
|
2007
|
Garrett County Health Dept.
|
$23,000
|
|
|
|
|
|
|
Program Plans:
1 .Bicycle / Pedestrian Education Program
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Encouragement Program |
| Program Highlights to Date:
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| GARRETT |
|
2008 - 2009
|
Garrett County Health Dept.
|
$39,200
|
|
3,100
|
|
|
|
3,100
|
Program Plans:
1 .Bicycle / Pedestrian Education Program
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Speed Trailer |
| Program Highlights to Date:
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| GARRETT |
|
2009 - 2010
|
Garrett County Health Dept.
|
$7,800
|
|
2,986
|
|
|
|
2,986
|
Program Plans:
1. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Third year grant activities are just beginning. Second year grant carried over through 2009 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| HARFORD |
|
2008 - 2010
|
Harford County Health Deparment
|
$37,100
|
|
579
|
|
|
|
579
|
Program Plans:
1. Safe Routes mapping
2. Bicycle / Pedestrian Education Program
3. Infrastructure (sidewalks, crosswalk marking)
4. Encouragement Program
5. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement |
Program Highlights to Date:
1. Safety has been increased around the school with law enforcement detail efforts - awareness of the program has been raised.
2. Walking school bus program begun |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| HARFORD |
|
2009 - 2010
|
|
$54,200
|
|
|
|
|
|
|
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking) |
| Program Highlights to Date:
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| HARFORD |
|
2010 - 2011
|
|
$10,700
|
|
554
|
| |
|
Edgewood Elem |
420 |
|
|
|
974
|
Program Plans:
1. Infrastructure (pedestrian signals / signage , crosswalk marking) |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| HARFORD |
|
2010 - 2011
|
Harford County Sheriff's Office
| $57,700
|
|
473
|
| |
|
Aberdeen Middle |
1081 |
|
|
|
1,554
|
Program Plans:
1. Infrastructure (sidewalks, raised crosswalk, pedestrian signals / signage)
2. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| HOWARD |
|
2007
|
Howard County Traffic Engineering Division
|
$262,000
|
|
|
|
|
Harper's Choice Middle |
|
|
|
|
|
Program Plans:
1. Safe Routes mapping
2. Bicycle / Pedestrian Education Program
3. Infrastructure (sidewalks, crosswalk marking) |
Program Highlights to Date:
1. Installation of new sidewalk along Little Patuxent Parkway
2. Pathway construction at Swansfield Elem |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| KENT |
|
2007 |
Kent County Health Department
|
$67,400
|
|
|
|
|
|
|
|
|
|
|
Program Plans:
1. Infrastructure (bike racks)
2. Bicycle / Pedestrian Education Program
3. Encouragement Program
4. Hosting National Safe Routes to School Course for SRTS Coordinators |
Program Highlights to Date:
1. Installation of bike racks at_____
2. Successful poster contest leading to production of a SRTS calendar with student artwork
3. Well attended national course at Galena Middle School |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| KENT |
|
2009 - 2010 |
Kent County Health Department
|
$72,800
|
Henry Highland Garnett Elem |
241
|
| |
|
Chestertown Middle |
233 |
| |
|
Galena Middle |
257 |
| |
|
Rock Hall Middle |
138 |
| |
|
Millington Elem |
215 |
| |
|
Rock Hall Elem |
201 |
| |
|
Worton Elem |
234 |
|
|
|
1,519 |
Program Plans:
1. Infrastructure (sidewalks, bike racks)
2. Bicycle / Pedestrian Education Program
3. Poster contest / student art calendars |
Program Highlights to Date:
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY |
|
2007 |
Office of the County Executive
|
$139,200
|
|
|
|
|
|
|
Program Plans:
1. Bicycle / Pedestrian Education Program
2. Encouragement Program |
Program Highlights to Date:
1. Program ended due to inability to hire SRTS Coordinator |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY |
|
2008 - 2009 |
Office of the County Executive
|
$331,700
|
Stone Mill Elem |
640 |
| |
|
Georgian Forest Elem |
468 |
| |
|
Thurgood Marshall Elem |
544 |
| |
|
Greenwood Elem |
575 |
| |
|
Cannon Road Elem |
382 |
| |
|
Flower Hill Elem |
500 |
| |
|
Clearspring Elem |
633 |
| |
|
Olney Elem |
602 |
| |
|
Kinsview Middle |
839 |
| |
|
Rosa Parks Middle |
914 |
| |
|
Martin Luther King Middle |
730 |
|
|
|
6,827 |
Program Plans:
1. School Zone safety assessments
2. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage)
3. Bicycle / Pedestrian Education Program
4. Encouragement Program |
Program Highlights to Date:
1. Education and Encouragement programs were conducted
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY |
|
2009 - 2010 |
Office of the County Executive
|
$229,500
|
Earle B Wood Middle |
804 |
| |
|
Jackson Road Elem |
539 |
| |
|
Woodlin Elem |
420 |
| |
|
Westbrook Elem |
340 |
| |
|
Argyle Middle |
779 |
| |
|
Rock View Elem |
493 |
|
|
|
3,375 |
Program Plans:
1. School Zone safety assessments
2. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage)
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
4. Bicycle / Pedestrian Education Program
5. Encouragement Program |
Program Highlights to Date:
1. Assessments completed at some schools
2. Safe walking routes determined at 4 target schools
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY |
|
2010 - 2011 |
Office of the County Executive
|
$63,700
|
15 Elem / Middle Schools |
9,320 |
|
|
|
9,320 |
Program Plans:
1. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
2. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction
|
Agency
|
Original Funding
|
Schools
|
# Students |
| MONTGOMERY Rockville |
2007
|
City of Rockville
|
|
|
413 |
|
|
Meadow hall Elem |
344 |
|
|
Twinbrook Elem
|
527 |
|
|
Beall Elem
|
634 |
|
|
College Gardens Elem
|
519 |
|
|
Julius West Middle
|
960 |
|
|
|
3,397 |
Program Plans:
1. Infrastructure (sidewalks, traffic calming, ADA ramps, crosswalk marking, pedestrian signals / signage / school zonesignage / speed indicator signs
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program
4. Encouragement Program |
Program Highlights to Date:
1. Completion of 1700 feet of sidewalk at Beall and Twinbrook Elem schools
2. Traffic calming (raised crosswalk) at Julius West
3. Installation of flashing beacons and speed indicator signs at Ritchie Park and College Gardens Elem schools
4. Successful school zone enforcement details resulting in 891 citiations and 1,252 warnings within school walking zones
5. Over 11,000 students reached with ped/bike education program |
|
|
| |
|
|
| |
Jurisdiction
|
Agency
|
Original Funding
|
Schools
|
# Students |
| MONTGOMERY Rockville |
2008 - 2010
|
City of Rockville
|
|
|
634
|
|
|
Julius West Middle |
960 |
|
|
|
1,594
|
Program Plans:
1. Infrastructure (sidewalks)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program
4. Encouragement Program |
Program Highlights to Date:
1. Engineering / approvals underway for infrastructure projects
|
|
|
| |
|
|
| |
Jurisdiction
|
Agency
|
Original Funding
|
Schools
|
# Students |
| MONTGOMERY Rockville |
2009 - 2010
|
City of Rockville
|
|
|
634 |
|
|
Meadow Hall Elem |
344 |
|
|
Twinbrook Elem
|
527 |
|
|
Maryvale Elem |
615 |
|
|
|
2,120 |
Program Plans:
1. Bicycle / Pedestrian Education Program
2. Encouragement Program
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement |
Program Highlights to Date:
1. Education program has been completed at 8 schools |
|
|
| |
|
|
| |
Jurisdiction
|
Agency
|
Original Funding
|
Schools
|
# Students |
| MONTGOMERY Rockville |
2010 - 2011
|
City of Rockville
|
|
|
634 |
|
|
Meadow Hall Elem |
344 |
|
|
Twinbrook Elem
|
527 |
|
|
Maryvale Elem |
615 |
|
|
|
2,120 |
Program Plans:
1. Bicycle / Pedestrian Education Program
2. Infrastructure (sidewalks)
3. Encouragement Program
4. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY Takoma Park |
|
2007
|
|
|
East Silver Spring Elem
|
227 |
|
|
Piney Branch Elem
|
429 |
|
|
Rolling Terrace Elem |
659 |
|
|
Takoma Park Elem
|
400 |
|
|
Takoma Park Middle |
840 |
|
|
John Nevins Andrews (K-8)
|
174 |
|
|
Sligo Adventist (K-8) |
149 |
|
|
TOTAL # Students |
2,878 |
Program Plans:
1. Infrastructure (sidewalks, intersection reconstruction, bike racks)
2. Missing sidewalk study
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
4. Encouragement Program |
Program Highlights to Date:
1 Sidewalk installation on Grant Ave.
2. Sidewalk improvements on Slgo Creek Parkway and Maple Ave.
3. Bike Racks at Takoma Park Middle
4. Off Road trail rehabilitation
5. Piney Branch hosts International Walk to School Day |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY Takoma Park |
|
2008 - 2010
|
|
|
East Silver Spring Elem
|
227 |
|
|
Piney Branch Elem
|
429 |
|
|
Rolling Terrace Elem |
659 |
|
|
Takoma Park Elem
|
400 |
|
|
Takoma Park Middle |
840 |
|
|
John Nevins Andrews (K-8)
|
174 |
|
|
Sligo Adventist (K-8) |
149 |
|
|
TOTAL # Students |
2,878 |
Program Plans:
1. Infrastructure (sidewalks)
2. Missing sidewalk study, contnued
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
4. Encouragement Program |
Program Highlights to Date:
1. Engineering / approvals underway for infrastructure projects
2. Establishment of the SRTS 5K walk/run event to raise awareness
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY Takoma Park |
|
2009 - 2010
|
|
|
East Silver Spring Elem
|
227 |
|
|
Piney Branch Elem
|
429 |
|
|
Rolling Terrace Elem |
659 |
|
|
Takoma Park Elem
|
400 |
|
|
Takoma Park Middle |
840 |
|
|
John Nevins Andrews (K-8)
|
174 |
|
|
Sligo Adventist (K-8) |
149 |
|
|
TOTAL # Students |
2,878 |
Program Plans:
1. Infrastructure (sidewalks)
2. Bicycle / Pedestrian Education Program
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
4. Encouragement Program |
Program Highlights to Date:
1. Engineering is underway for infrastructure projects
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY Takoma Park |
|
2010 - 2011
|
|
|
East Silver Spring Elem
|
227 |
|
|
Piney Branch Elem
|
479 |
|
|
Rolling Terrace Elem |
659 |
|
|
Takoma Park Elem
|
400 |
|
|
Takoma Park Middle |
840 |
|
|
John Nevins Andrews (K-8)
|
174 |
|
|
Sligo Adventist (K-8) |
149 |
|
|
TOTAL # Students |
2,928
|
Program Plans:
1. Infrastructure (sidewalks)
2. Bicycle / Pedestrian Education Program
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
4. SRTS 5K Walk/Run |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| MONTGOMERY Kensington / Chevy Chase View |
|
2010 - 2011
|
Kensington / Chevy Chase View
|
|
Kensington Parkwood Elem
|
556 |
|
|
Holy Redeemer Elem/Mid |
390 |
|
|
Grace Episcopal Elem/Mid |
162 |
|
|
TOTAL # Students |
1.108
|
Program Plans:
1. Infrastructure (sidewalks)
2. Encouragement Program |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| PRINCE GEORGE'S |
|
2007
|
City of District Heights
|
$66,700
|
District Heights Elem
|
425 |
|
|
TOTAL # Students |
425 |
Program Plans:
1. Infrastructure (sidewalks, raised intersection)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement |
Program Highlights to Date:
1. Plans approved and out for bid on infrastructure program |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| PRINCE GEORGE'S |
|
2009 - 2010
|
City of College Park |
$67,730
|
Hollywood Elem
|
402
|
|
|
TOTAL # Students |
402
|
Program Plans:
1. Infrastructure (sidewalks) |
Program Highlights to Date:
1. Over 1700 feet of sidewalk completed on Muskogee Street and Edgewood Road |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| PRINCE GEORGE'S |
|
2010 - 2011
|
City of College Park |
$124,500 |
Hollywood Elem
|
402
|
|
|
TOTAL # Students |
402
|
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking) |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| PRINCE GEORGE'S |
|
2010 - 2011
|
City of Greenbelt |
$136,800 |
Springhill Lake Elem
|
620
|
|
|
TOTAL # Students |
620
|
Program Plans:
1. Infrastructure (Median and curb extensions, crosswalk marking)
2. Encouragement Program |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| QUEEN ANNE'S |
|
2008
|
Queen Anne's Sheriff's Office |
$24,800
|
|
|
|
|
TOTAL # Students |
|
Program Plans:
1. Speed surveys
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Law enforcement details were conducted |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
Students
|
| SOMERSET |
|
2007
|
Princess Anne Police Department
|
$86,800
|
Princess Anne Primary
|
|
|
|
Greenwood Elem |
450
|
|
|
TOTAL # Students |
|
Program Plans:
1. Infrastructure (crosswalk marking, school zone signage, Repair of dangerous drainage ditch within school walking zone)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Successful school zone enforcement resulting in many speed and pedestrian right of way tickets |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
Students
|
| SOMERSET |
|
2008 - 2010
|
Princess Anne Police Department
|
$56,800
|
Princess Anne Primary
|
|
|
|
Greenwood Elem |
450
|
|
|
TOTAL # Students |
960 |
Program Plans:
1. Infrastructure (bike racks, traffic calming)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Encouragement Program |
Program Highlights to Date:
1. Engineering / approvals underway for infrastructure projects
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools
|
# Students
|
| WASHINGTON |
|
2007
|
Washington County Health Department
|
$254,100
|
Emma K Doub Elem
|
|
|
|
E Russell Hicks Middle |
nbsp; |
|
|
Winter Street Elem |
272 |
|
|
Salem Ave Elem
|
604
|
|
|
TOTAL # Students |
|
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Create walking school bus routes
4. Bicycle / Pedestrian Education Program
5. Encouragement Program |
Program Highlights to Date:
1. Sidewalk installation at Emma K Doubs and E Russell Hicks
2. Active ped/bike education program including several bike rodeos |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools
|
# Students
|
| WASHINGTON |
|
2008 - 2010
|
Washington County Health Department
|
$385,000
|
Sharpsburg Elem
|
|
|
|
Williamsport Elem |
|
|
|
Winter Street Elem |
272 |
|
|
Western Heights Middle |
|
|
|
TOTAL # Students |
|
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools
|
# Students
|
| WASHINGTON |
|
2009 - 2010
|
Washington County Health Department
|
$63,500 |
Fountaindale Elem |
422 |
|
|
Pangborn Elem |
668 |
|
|
Northern Middle |
700 |
| |
|
Maugansville Elem |
356 |
| |
|
Salem Ave Elem |
650 |
|
|
Winter Street Elem |
283 |
|
|
TOTAL # Students |
3,079 |
Program Plans:
1. Infrastructure (sidewalks)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Engineering is underway for infrastructure projects
2. Law enforcement details are underway
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools
|
# Students
|
| WASHINGTON |
|
2010 - 2011
|
Washington County Health Department
|
$112,700 |
Western Heights Middle |
681 |
|
|
Pangborn Elem |
682 |
|
|
Northern Middle |
662 |
| |
|
Salem Ave Elem |
695 |
|
|
TOTAL # Students |
2,270 |
Program Plans:
1. Infrastructure (sidewalks, bike racks)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools
|
# Students
|
| WICOMICO |
|
2008 - 2010
|
Wicomico County Roads Division
|
$263,000
|
Salisbury Middle |
923
|
|
|
TOTAL # Students |
923 |
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage)
2. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement
3. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
|
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| WORCHESTER |
2007
|
Worcester County Health Department |
$179,600 |
Berlin Intermediate
|
730 |
|
|
Snow Hill Elem |
361 |
|
|
Snow Hill Middle |
390 |
|
|
Cedar Chapel Special |
49
|
|
|
Pokomoke Middle
|
411 |
|
|
TOTAL # Students |
1,941 |
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage)
2. Bicycle / Pedestrian Education Program |
Program Highlights to Date:
1. Engineering plans are underway for sidewalk and crosswalk projects |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| WORCHESTER |
2008 - 2010
|
Worcester County Health Department |
$168,100
|
Berlin Intermediate
|
730
|
|
|
Snow Hill Elem |
361 |
|
|
Snow Hill Middle |
390 |
|
|
Cedar Chapel Special |
49
|
|
|
Pokomoke Middle
|
411 |
|
|
TOTAL # Students |
1,941
|
Program Plans:
1. Infrastructure (sidewalks, crosswalk marking, pedestrian signals / signage)
2. Bicycle / Pedestrian Education Program
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement |
Program Highlights to Date:
1. Engineering plans are underway for sidewalk and crosswalk projects
2. Education program is active |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| WORCHESTER |
2010 - 2011
|
Worcester County Health Department |
$63,800
|
Ocean City Elem |
563
|
|
|
TOTAL # Students |
563
|
Program Plans:
1. Infrastructure (sidewalks, bike racks, pedestrian signals / signage)
2. Bicycle / Pedestrian Education Program
3. Law enforcement overtime for school zone speeding and pedestrian right of way enforcement |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| STATEWIDE |
2008 - 2009
|
Washington Area Bicyclist Association
|
$74,000
|
N/A |
N/A
|
Program Plans:
1. Bicycle / Pedestrian Education Program
2. "Train the Trainer" program
3. Making inroads into getting ped/bike curriculum approved in school systems |
Program Highlights to Date:
1. Excellent progress on "Train the Trainer" program in Baltimore City
2. Curriculum approved in Baltimore |
|
|
| |
|
|
| |
Jurisdiction |
Agency
|
Original Funding
|
Schools |
# Students |
| STATEWIDE |
2010 - 2011
|
Washington Area Bicyclist Association
|
$73,500
|
N/A |
N/A
|
Program Plans:
1. Bicycle / Pedestrian Education Program
2. "Train the Trainer" program
3. Making inroads into getting ped/bike curriculum approved in school systems |
Program Highlights to Date:
1. Grant Activities do not begin until January 2010 |
|
|
| |
|
|
| |
|
|